• <em id="ztqds"></em>
  • <dd id="ztqds"><track id="ztqds"><video id="ztqds"></video></track></dd>
      <dd id="ztqds"></dd>

          <rp id="ztqds"></rp>

          ŹÖ»ś°ę²¶Óć
          Quality Control

          ””

          Mold Flowchart
          Part Control
          Tech Blog
          Products & Moulds

          ””

          TV & LCD Series
          Vacuum Collector Series
          Wash Machine Series
          Air Conditioner Series
          Auto & Motorcycle Series
          Commodity Series
          Others
          Die Casting Moulds
          Our "BEST"

          ””

          Best Solution
          Endless Development
          Satisfied Service
          Technical Support
          Home>Quality Control>Part Control

          1:After T1(the First Test), We will get 10/E (10 moulding) samples,5/E of them will be sent to our customer, and 
          the rest 5/E will be Controlled by our QC worker according to the Part 2D drawing through measurement tools
          like follows:
          2:After finishing controls, We will get the ”°Part Control Report”±,from which we can know if the dimension is within
          the normal tolenrance,and if the Part respect the 2D Part drawing.Then, We send the ”°Part Control Report”± to 
          our customer for Confirmation or to make modification on the mould.

          3:The Part Control Report is the formal file for us, We normally put it with testing samples together in the 
          documents in record.
          ””
          Copyright © 2013 Yuyao Yugao Plastic Mould Co., Ltd. All Rights Reserved
          Tel:86-574-62123197 Fax:86-574-62123197 E-mail:yugao-5@yuyaoyugao.com